Intro to Halcyon’s BESS Tracker
Halcyon's BESS Tracker compiles information on newly proposed, in development, and under construction battery energy storage systems across the United States. The dataset consolidates key project details into a structured, research-ready dataset, drawing from state public utility commission (PUC/PSC), regional grid operator (ISO/RTO), and Federal Energy Regulatory Commission dockets, as well as U.S. Energy Information Administration (EIA) datasets.
Each project entry captures essential attributes such as docket numbers, project names, capacity, size, duration, technology type, development milestones, planned operating year, point-of-interconnection, and developers. Where available, the dataset includes granular details such as parent company, contracted capacity, relationship to data centers, battery manufacturer, cost figures, behind-the-meter, co-location specifics, and inverter make and model.
Human-in-the-loop
Halcyon's analysts use AI-assisted search to identify relevant filings, and each data point is validated by subject-matter experts. The result is a uniquely reliable resource for understanding the scale, timing, and characteristics of upcoming battery storage across the U.S. electricity landscape.
Halcyon updates the Grid to incorporate new projects weekly and updates already tracked projects on a monthly basis as information becomes available.
More information you would like to know across all projects?
Subscribers can add new columns to tease out details for their bespoke purpose. Choose from one or two words, a short phrase, a few sentences, dates, years, whole number, decimal number, or true/false to fetch the information in the format of your choosing.
The more verbose your question, the better. As our head of engineering likes to remind us, robots do best when instructed explicitly, “do what I say, not what I mean.”
Methodology
Field | Column Type | Description |
Project Name | Text | Name of the battery energy storage system project |
State | Text | State where the project is located |
County | Text | County/Parish where the project is located |
BA Code | Text | Relevant balancing authority |
Utility | Text | The utility providing transmission and distribution for the BESS |
Docket Number | Text | Proceeding numbers for the applicable state Commission, ISO/RTO, or FERC
Typically an interconnection agreement, exempt wholesale generator, certificate of public convenience, or power company registration proceeding
Citations include a link to Halcyon AI generated Docket Profile Page. |
Technology | Text | Battery technology type |
Capacity (MW) | Decimal number | The maximum electric output an electricity generator can produce under specific conditions |
Size (MWh) | Decimal number | Total potential power a storage system can contain |
Duration | Decimal number | Number of hours of continuous discharge of power |
Counterparties | Text | The names of the counterparties with anticipated or signed agreements for dedicated offtake from the project. |
Contracted (MW) | Decimal number | The contracted or guaranteed peak power capacity of the project in megawatts (MW) |
Contracted (MWh) | Decimal number | The contracted or guaranteed energy capacity of the project in megawatt-hours (MWh) |
Contracted Capacity Details | Text | Description of the contracted capacity arrangement, such as the agreement type, key performance obligations, and any penalty or liquidated damages provisions for capacity shortfalls |
Data Center Details | Text | Description of the project's relation to a data center, hyperscale facility, cloud campus, server farm, data processing facility, or similar, if applicable. |
Announcement Date | Date | Earliest date with information on the project in Commission proceedings |
Construction Start Date | Date | Expected or actual date for construction to begin |
Commercial Operation Date | Date | Expected or actual date of commercial operation (COD) |
Queue Number | Text | Unique identifier assigned to project by regional grid operator (ISO/RTO) |
Project Status | Text | The project's current state at a high level: announced, in development, in construction, constructed, operating, or canceled |
Study and Permit Status | Text | A more detailed status for the project, such as permitting, feasibility study, interconnection requested, interconnection agreement executed, energization, etc. |
Status Description | Text | A long-form description of the project’s development status, including key milestones such as permitting progress, offtake agreement execution dates, and construction timing. |
LGIA | True/False | True if the project has a Large Generator Interconnection Agreement for the project
Click the citation to get to the latest LGIA |
SGIA | True/False | True if the project has a Standard Generator Interconnection Agreement for the project
Click the citation to get to the latest LGIA |
EWG | True/False | True if the project has a Exempt Wholesale Generator filing for the project
Click the citation to get to the latest LGIA |
CPCN | True/False | True if the project has a Certificate of Public Convenience and Necessity for the project
Click the citation to get to the latest LGIA |
ESA | True/False | True if the project has a Energy Storage Agreement for the project
These may be energy storage agreements, tolling agreements, power purchase agreements, or other agreements for offtake of storage capacity
Click the citation to get to the latest LGIA |
Inverter Size (kW) | Decimal number | Cumulative inverter size or power rating in kilowatts |
Inverter Details | Text | Details such as the inverter configuration, make and model, number of units, and per unit rating |
Inverter Make | Text | The supplier / manufacturer of the inverter |
Inverter Model | Text | Specific model of the inverter |
# Units | Whole number | Number of units of the inverter for the project |
Battery Manufacturer | Text | The company that produces the battery cells / modules used in the project |
Co-Located Generation | True/False | True if the BESS is co-located, paired, or hybridized with another generation facility (e.g., solar, wind, natural gas).
False otherwise. |
Co-Located Generation Details | Text | If co-located, details such as the name of the paired generation project, its capacity, the shared interconnection.
Blank otherwise. |
Behind-the-Meter | True/False | True if the energy storage is or will be installed on the customer's side of the utility meter.
False otherwise. |
Point of Interconnection | Text | The substation, bus, or transmission node where the BESS connects to the electric grid |
Substation | Text | Name of the POI substation or switching station |
Voltage | Kilovolts of the POI substation or switching station | |
Location Details | Text | Street address, city, or other description of the project location |
Coordinates | Text | Latitude and longitude
Exact coordinates or approximate at a street address level
Projects with only an approximate location known (e.g., city, county) are blank |
Parent Company | Text | The highest level company involved in developing or owning the project |
Developers | Text | The companies responsible for developing, owning, or leading the construction of the project through its phases |
CapEx ($M) | Decimal number | Anticipated upfront cost to build the project |
Cost ($/kWh) | Decimal number | Capital cost per kilowatt hour of storage capacity |
Cost ($/kW) | Decimal number | Capital cost per kilowatt of installed capacity |
Cost Details | Text | Details around costs, such as regarding construction, battery stack, cost overruns, and more |
Data Handling
To standardize information for convenient interpretation in the dataset, Halcyon converts some information into normalized formats. This is only done for clarity, never to “fudge” information. Halcyon’s #1 goal is to faithfully represent information presented in the regulatory record.
Type / Field | Description |
Dates | Construction and commercial operation date are often disclosed as quarterly periods (e.g., “Q3 2026”). Halcyon converts these to dates based on the last day of the period (e.g., “Q3 2026” → “September 30, 2026”) |
Coordinates | Halcyon provides latitude and longitude coordinates only when they are disclosed precisely. If the degrees-minutes-seconds (or decimal version) are disclosed in the regulatory record, we capture them. If the street address is provided, we approximate coordinates based on that address. But if the project’s location is only known to a city, county, or other high-level, then the Coordinates field is left blank. |
Verified but not Cited | As of September 2026, Halcyon does not yet support citations to authoritative tabular sources such as the EIA 860, ERCOT interconnection queue xlsx, etc. Halcyon’s BESS Tracker includes information from those sources, such as developers, commercial operation dates, and more. These cells have no-citations but are verified with the source. |